试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
A school project will monitor outdoor air and increase the ventilation of the bu admin 2012-11-1 0627 admin 2012-11-1 00:48
A manufacturing building in a southern climate will use extensive photovoltaic p admin 2012-11-1 0664 admin 2012-11-1 00:48
A new veterinary office is being built on a greenfield site. The office and park admin 2012-11-1 0626 admin 2012-11-1 00:48
Which of the following LEED prerequisites/credits require drawings as part of th admin 2012-11-1 0657 admin 2012-11-1 00:48
A fire station in a cool northern climate is being designed with natural ventila google 2012-11-1 0746 google 2012-11-1 00:48
What is the most common failure in daylighting strategies? admin 2012-11-1 0788 admin 2012-11-1 00:48
During a major renovation of an existing office building, an owner decides to re admin 2012-11-1 0767 admin 2012-11-1 00:48
What has the lowest priority in building design? admin 2012-10-30 0796 admin 2012-10-30 05:04
What impacts a project’s ability to achieve Development Density? admin 2012-10-30 01460 admin 2012-10-30 04:30
A potential LEED project could be certified under either LEED for Existing Build google 2012-10-29 0852 google 2012-10-29 04:55
What best defines the project boundary? google 2012-10-28 01678 google 2012-10-28 22:55
A multi-family building that is 3 stories would be certified under what rating s google 2012-10-28 0918 google 2012-10-28 22:21
An owner is considering potential building sites for a new factory. Which of th admin 2012-10-23 0638 admin 2012-10-23 14:24
A project has already qualified for one point under Sustainable Sites credit, He admin 2012-10-23 0560 admin 2012-10-23 14:24
A manufacturing plant will install solar car ports in the parking lot to generat admin 2012-10-23 0558 admin 2012-10-23 14:24
For a site with existing imperviousness less than or equal to 50%, which of the admin 2012-10-23 0563 admin 2012-10-23 14:24
A proposed 80,000 SF building with 4 equal floors is being built for office spac admin 2012-10-23 0609 admin 2012-10-23 14:24
Which member of the project team would be responsible for developing and impleme admin 2012-10-23 0566 admin 2012-10-23 14:24
Which of the following site/building conditions would disqualify the project for admin 2012-10-23 0688 admin 2012-10-23 14:24
To be compliant with Option 1 of Sustainable Sites credit, Heat Island Effect: R admin 2012-10-23 0593 admin 2012-10-23 14:24

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 15:17 , Processed in 0.045114 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部