LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
What fixture, fitting, or appliance is outside the scope of the water use reduct google 2013-8-6 0548 google 2013-8-6 05:49
A redevelopment project will have only single story retail buildings on the prop google 2013-8-6 0554 google 2013-8-6 05:49
A site has 10,000 square feet of buildable land area and a 5,000 square foot par google 2013-8-6 0547 google 2013-8-6 05:49
A 5 acre project in a city has two office buildings with retail and no residenti google 2013-8-2 0918 google 2013-8-2 13:18
For what minimum amount of time must a conservation management plan be carried o google 2013-8-2 0593 google 2013-8-2 13:18
On what type of sites must the state fish and wildlife agency and the state natu google 2013-8-2 0653 google 2013-8-2 13:17
Durable goods have a useful life of ____ or more. google 2013-8-2 0573 google 2013-8-2 11:10
What minimum area of landscape needs to be submetered for WE Credit 1 Water google 2013-7-29 0597 google 2013-7-29 20:05
A residential project will include new streets. What can be substituted for side google 2013-7-24 0568 google 2013-7-24 14:56
A transit agency determines that transit stops will be warranted within two year google 2013-7-24 0547 google 2013-7-24 14:56
When submitting maps for documentation, what should be included on the map?
google 2013-7-24 0587 google 2013-7-24 14:56
For single dwelling unit buildings what does each unit need for Visitability? google 2013-7-24 0561 google 2013-7-24 14:56
What three types of maps should project teams use for documentation?
(Choose
google 2013-7-24 0548 google 2013-7-24 14:56
What should be addressed in the design for an optimal building orientation?
google 2013-7-24 0548 google 2013-7-24 14:56
What must be excluded from the calculations for building reuse?
(Choose 2)
google 2013-7-24 0687 google 2013-7-24 14:56
A residential project will include 200 new dwelling units on 10 acres. What must google 2013-7-24 0891 google 2013-7-24 14:56
Which of the following does not have to occur to qualify for GIB Credit Solar Or google 2013-7-24 0552 google 2013-7-24 14:56
Which of the following are structural controls for construction activity polluti google 2013-7-24 0530 google 2013-7-24 14:56
A nonresidential building project will have new off-street surface parking lots google 2013-7-24 0550 google 2013-7-24 14:56
Which of the following design strategies would not qualify for SLL Credit Restor google 2013-7-24 0558 google 2013-7-24 14:56

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-11 11:34 , Processed in 0.054662 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部