LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
When can intersections within a site be counted for connectivity for SLL Credit google 2013-8-27 0640 google 2013-8-27 10:13
A developer for a LEED-ND project is: google 2013-8-27 0620 google 2013-8-27 10:08
A residential project will have 100 new dwelling units added to 80 existing dwel google 2013-8-27 0621 google 2013-8-27 10:07
A new single-family residential building does not have an ENERGY STAR rating. Ho google 2013-8-27 0589 google 2013-8-27 10:06
A project for a previously developed site has a slope over 40% that will require google 2013-8-27 0614 google 2013-8-27 10:04
A residential project will have 600 dwelling units. 200 of the units will be gro google 2013-8-27 0614 google 2013-8-27 10:03
What average percentage improvement over ASHRAE 90.1-2007 would new nonresidenti google 2013-8-27 0589 google 2013-8-27 10:03
A project will have 2 new office buildings and 3 existing buildings. The average google 2013-8-27 0656 google 2013-8-27 10:02
Purchasing products that have been developed with a sustainable design is an exa google 2013-8-21 0593 google 2013-8-21 11:29
How does calculating a project’s Green Power compare to calculating a project’ admin 2012-11-5 11457 keychen 2013-8-7 23:55
What functions of a wetland would a qualified biologist not need to determine fo google 2013-8-6 0643 google 2013-8-6 05:49
What statement is not true regarding SLL Credit Reduce Automobile Dependence, Op google 2013-8-6 0563 google 2013-8-6 05:49
What organizations are responsible for the development of the LEED for Neighborh google 2013-8-6 0568 google 2013-8-6 05:49
A nonresidential project design will have functional entries for buildings measu google 2013-8-6 0556 google 2013-8-6 05:49
What are some attributes of neighborhoods?



(Choose 3)
google 2013-8-6 0570 google 2013-8-6 05:49
For a new multiunit residential building project, what can the project team do t google 2013-8-6 0561 google 2013-8-6 05:49
When submitting maps for documentation, what should be included on the map?
google 2013-8-6 01020 google 2013-8-6 05:49
A project is defining a 100 foot buffer around a significant habitat. What must google 2013-8-6 0598 google 2013-8-6 05:49
What principles were used as the basis for the development of the LEED for Neigh google 2013-8-6 0599 google 2013-8-6 05:49
For a bicycle network, an off-street bicycle lane must be how wide for a two-way google 2013-8-6 0589 google 2013-8-6 05:49

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 15:56 , Processed in 0.053799 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部