What portions of a site may be exempt from the requirements of SLL Credit Steep google 2013-8-27 0628 google 2013-8-27 12:44
A project is not an infill or previously developed site and has a floodplain. Wh google 2013-8-27 0617 google 2013-8-27 11:36
What minimum number of visitor bicycle racks is required for a 100,000 square fo google 2013-8-27 0646 google 2013-8-27 11:34
By what amount must external lighting levels be reduced in residential areas for google 2013-8-27 0586 google 2013-8-27 11:34
Which site would be classified as an infill site?
google 2013-8-27 0632 google 2013-8-27 11:29
What minimum average percent improvement in energy efficiency over ASHRAE 90.1-2 google 2013-8-27 0610 google 2013-8-27 11:27
A project is located on a site with no wetlands and no water bodies. What must o google 2013-8-27 01062 google 2013-8-27 11:23
Which building would not meet the requirements for GIB Prerequisite Certified Gr google 2013-8-27 0598 google 2013-8-27 11:21
What is the maximum area that should be appropriately considered for a LEED for google 2013-8-27 0649 google 2013-8-27 11:19
Which of the following options is available only to projects with a residential google 2013-8-27 0583 google 2013-8-27 10:53
For retail projects to achieve SLL Credit Bicycle Network and Storage what featu google 2013-8-27 0603 google 2013-8-27 10:51
What recreation facility would not qualify towards NPD Credit 10 Access to Recre google 2013-8-27 0599 google 2013-8-27 10:49
A 5 acre project will include mixed-use buildings and nonresidential buildings a google 2013-8-27 0629 google 2013-8-27 10:28
A redevelopment project will add several new streets to a neighborhood with exis google 2013-8-27 0604 google 2013-8-27 10:25
A project team has determined there are 180 dwelling units and nonresidential bu google 2013-8-27 0583 google 2013-8-27 10:23
A project’s development footprint affects land with prime soils. The project wi google 2013-8-27 0638 google 2013-8-27 10:20
What requirements must be met to achieve SLL Credit 2 Brownfields Redevelopment, google 2013-8-27 0604 google 2013-8-27 10:19
What is the project site equivalent to? google 2013-8-27 0986 google 2013-8-27 10:16
For NPD Credit Walkable Streets, what percent of retail, service, and trade uses google 2013-8-27 0609 google 2013-8-27 10:16
A project will have ten habitable buildings. Eight of the buildings will be new google 2013-8-27 0654 google 2013-8-27 10:14

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 15:56 , Processed in 0.055019 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部