LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
A project includes retail and residential. What sidewalk design will help a proj google 2013-8-29 0562 google 2013-8-29 09:30
A project team has designed and constructed an anaerobic biological treatment fa google 2013-8-29 0562 google 2013-8-29 09:29
What would qualify as a very high efficiency fixture or fitting?
google 2013-8-29 0584 google 2013-8-29 09:27
A 5 acre project will include a single new retail building. The street-facing bu google 2013-8-29 0606 google 2013-8-29 09:24
What does the Simpson Diversity Index calculate?
google 2013-8-29 0562 google 2013-8-29 09:23
An infill project in a non-historic district will include new retail spaces and google 2013-8-29 0558 google 2013-8-29 09:21
Which project would meet the asset requirements of SSL Prerequisite Smart Locati google 2013-8-29 0607 google 2013-8-29 09:11
The length of all sidewalks in a project is 5,000 feet. What maximum amount of i google 2013-8-29 0593 google 2013-8-29 09:07
Which of the following cannot be disturbed when reusing existing building stock? google 2013-8-29 0558 google 2013-8-29 09:04
A project will provide street trees on both sides of at least 60% of new and exi google 2013-8-29 0620 google 2013-8-29 09:01
A project is located near an existing bicycle network. How close must diverse us google 2013-8-29 0563 google 2013-8-29 09:00
What is the latest time a management plan can be implemented for SLL Credit Long google 2013-8-29 0563 google 2013-8-29 08:45
A project contains a mix of uses, with 80% of project square footage residential google 2013-8-29 0598 google 2013-8-29 08:41
What amount of recycled content would a project team need to use to earn GIB Cre google 2013-8-29 0561 google 2013-8-29 08:40
Which of the following is not a requirement for NPD Credit Neighborhood Schools? google 2013-8-29 0586 google 2013-8-29 08:36
What must be true of an erosion and sedimentation control plan to qualify for GI google 2013-8-29 0562 google 2013-8-29 08:32
A site has a water body on it. What is not considered a minor improvement within google 2013-8-29 0583 google 2013-8-29 08:31
A project has residential density of 15 dwelling units/acre. The nonresidential google 2013-8-29 0562 google 2013-8-29 08:28
A project team has determined the buildable and nonbuildable land for a project. google 2013-8-29 0581 google 2013-8-29 08:25
What variables are not used to calculate the water efficiency of new buildings f google 2013-8-29 0564 google 2013-8-29 08:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-11 18:12 , Processed in 0.044891 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部