LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
On a site with 10,000 square feet of buildable land area, a floor-area-ratio (FA google 2013-8-29 0627 google 2013-8-29 13:35
What calculations are needed for GIB Credit Light Pollution Reduction?

google 2013-8-29 0643 google 2013-8-29 13:29
What diverse uses would qualify for a project to meet the requirements of a SSL google 2013-8-29 0591 google 2013-8-29 13:25
At what point should a project team meet with residents, business owners, and wo google 2013-8-29 0588 google 2013-8-29 13:24
For projects larger than 125 acres what minimum percent of dwelling units and no google 2013-8-29 0578 google 2013-8-29 12:04
A project used a LEED-compliant energy model for all of the floor area evaluated google 2013-8-29 0676 google 2013-8-29 12:01
What may require a land donation or sale in order to satisfy the requirements of google 2013-8-29 0603 google 2013-8-29 11:58
A project team will attempt to earn both NPD Credit 9 Access to Civic and Public google 2013-8-29 0579 google 2013-8-29 11:52
What is not a condition that a site could meet to be considered an infill site? google 2013-8-29 0577 google 2013-8-29 11:47
Which Green Infrastructure and Buildings credit does not have exemplary performa google 2013-8-29 0584 google 2013-8-29 11:42
A 100 acre site that is not previously developed has 40 acres with slopes betwee google 2013-8-29 0586 google 2013-8-29 11:40
What project areas are not included in a management plan for SLL Credit Long-Ter google 2013-8-29 0586 google 2013-8-29 11:36
Having clear ground floor windows can conflict with:
google 2013-8-29 0576 google 2013-8-29 11:28
What design speed is required for safe pedestrian and bicycle travel on new nonr google 2013-8-29 0592 google 2013-8-29 11:22
A project team is deciding on the project boundary. What cannot be included in t google 2013-8-29 0586 google 2013-8-29 11:17
A mixed-use, nonresidential project will have 1,000 linear feet of street-facing google 2013-8-29 0592 google 2013-8-29 10:51
What type of charrette would qualify a project for NPD Credit Community Outreach google 2013-8-29 0648 google 2013-8-29 10:46
Under what circumstances can a development occur within the 50 foot boundary of google 2013-8-29 0582 google 2013-8-29 10:01
Which of the following would qualify as a historic building for GIB Credit Histo google 2013-8-29 0613 google 2013-8-29 09:53
What is not excluded from the square mileage when calculating connectivity for i google 2013-8-29 0592 google 2013-8-29 09:48

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 16:18 , Processed in 0.043149 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部