LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
Which of the following standards for Indoor Air Quality were added in LEED v4 fo admin 2014-6-5 0569 admin 2014-6-5 13:53
A project team wants to reuse a building in a historic district for a project. W admin 2014-6-5 01486 admin 2014-6-5 13:53
Proper ventilation systems remove which of the following contaminants?(Choose 3) admin 2014-6-5 0638 admin 2014-6-5 13:43
What is NOT a LEED Minimum Program Requirement in LEED v4?(Choose 2) admin 2014-6-5 0641 admin 2014-6-5 13:38
For new construction projects, which of the following tools enable the project t admin 2014-6-5 0598 admin 2014-6-5 12:31
A project is located in an area with a demand-response program and that has enou admin 2014-6-5 0634 admin 2014-6-5 12:28
Which of the following indicates one of the final steps that should occur prior admin 2014-6-5 0584 admin 2014-6-5 12:25
Which of the following is NOT a guiding principle of USGBC? admin 2014-6-5 0626 admin 2014-6-5 11:57
RP Credit 1: Regional Priority
1–4 Points

Intent
To provide an
admin 2012-9-4 1872 韩青苗 2014-5-18 17:11
A core and shell project will contain 213,000 gross SF of which 183,180 SF are c admin 2012-8-12 1953 arcripts 2014-5-11 03:26
What are acceptable ways to reference LEED in product literature?(choose 2) admin 2012-9-7 11795 冯思舟 2014-5-4 15:51
What best defines durability? admin 2012-9-9 13636 冯思舟 2014-5-2 22:31
What is the purpose of the LEED Pilot Credit Library? admin 2012-9-10 12011 arcripts 2014-4-2 01:54
Question 2 Show Answer Legend The baseline case imperviousness for a project si admin 2012-7-29 11760 李明 2014-3-29 14:41
LEED GA考试申请 新人帖 孙雅琦 2014-2-20 0606 孙雅琦 2014-2-20 09:12
A development company has chosen a previously graded site in a suburban area on admin 2012-8-12 11174 greenhvd 2013-12-11 12:15
A project team is analyzing if the replacement of a chiller is necessary to earn google 2013-12-10 0632 google 2013-12-10 10:05
For a mechanically ventilated space, what are acceptable ways to meet the requir google 2013-12-10 0609 google 2013-12-10 10:05
Portion-controlled dilution devices for dispersing green cleaning chemicals can google 2013-12-10 0568 google 2013-12-10 10:05
A building is not eligible for an ENERGY STAR rating. The building will need to google 2013-12-10 0540 google 2013-12-10 10:05

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-12 03:03 , Processed in 0.060840 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部