LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
alternative fuel (替代燃料) admin 2014-12-8 0553 admin 2014-12-8 14:32
alternative daily cover (ADC) (每日覆盖替代材料 (ADC)) admin 2014-12-8 0886 admin 2014-12-8 14:32
adjacent site (相连场址) admin 2014-12-8 0564 admin 2014-12-8 14:32
added antimicrobial treatment (抗菌处理添加剂) admin 2014-12-8 0732 admin 2014-12-8 14:32
adapted plant (适应性植物) admin 2014-12-8 0783 admin 2014-12-8 14:32
abandoned property (废弃物业) admin 2014-12-8 01801 admin 2014-12-8 10:46
Which credit would not be applicable as part of the LEED application? admin 2012-11-10 21092 韩青苗 2014-6-11 16:11
Systems furniture and seating for a schools project that meets the GREENGUARD ce admin 2012-8-12 52039 韩青苗 2014-6-10 16:21
A new office building with a retail component on the first floor totals 254,000 google 2012-8-12 21056 武振东 2014-6-8 16:11
A PROJECT is undergoing a major renovation. A whole building energy simulation r admin 2012-9-29 1936 xiaokui1990 2014-6-8 05:21
Which of the following authorization levels in LEED Online is assigned to the pe admin 2014-6-6 0617 admin 2014-6-6 10:47
What urban area is a best choice for a LEED project? admin 2014-6-6 0564 admin 2014-6-6 10:47
Which of the following is aided by the avoidance of building on sensitive land o admin 2014-6-6 01003 admin 2014-6-6 10:47
After a building is completed and occupied, how can energy demand be reduced? admin 2014-6-6 0581 admin 2014-6-6 10:47
An owner wants to install a photovoltaic system on the building’s rooftop and s admin 2014-6-6 0591 admin 2014-6-6 10:47
Green buildings have on average energy use intensities that are ____ lower than admin 2014-6-6 0569 admin 2014-6-6 10:47
Which of these sites if selected would most help with increasing diversity of us admin 2014-6-6 0754 admin 2014-6-6 10:19
A developer is planning a mixed-use project that will include 1,000 single famil admin 2014-6-6 0663 admin 2014-6-6 10:19
When selecting windows for a building project, along with performance and adapta admin 2014-6-6 0822 admin 2014-6-6 10:11
What is one difference between LEED Interpretations and project CIRs? admin 2014-6-6 0649 admin 2014-6-6 10:11

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 17:23 , Processed in 0.044194 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部