LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
A retail project will be implemented using a bio-fuel based electrical system. W admin 2016-9-23 0888 admin 2016-9-23 11:19
A tenant is reviewing potential locations for a new office in an urban area. Wha admin 2016-9-23 0593 admin 2016-9-23 11:19
A project team is setting the schedule to conduct air-quality testing for EQ Cre admin 2016-9-23 0607 admin 2016-9-23 11:16
A project team for a small retail store is meeting early in the design process t admin 2016-9-23 0588 admin 2016-9-23 11:10
Which of the following is not a product as it applies to the Building Product Di admin 2016-9-23 0588 admin 2016-9-23 11:06
Which part of the LEED development cycle is used for streamlining the approach t admin 2016-9-23 0606 admin 2016-9-23 11:01
In a retail project using the prescriptive path for WE Prerequisite Indoor Water admin 2016-9-23 0654 admin 2016-9-23 10:59
A project team is using a tenent-level energy simulation for EA Credit Optimize admin 2016-9-23 0633 admin 2016-9-23 10:01
A project team is working on three retail spaces located on different sites in t admin 2016-9-23 0592 admin 2016-9-23 09:58
What can be excluded from the calculations for quality views in an office projec admin 2016-9-23 0611 admin 2016-9-23 09:49
Each naturally ventilated space in a project will need to include a mechanical v admin 2016-9-23 0626 admin 2016-9-23 09:46
When occupancy data is entered into the indoor water use calculator, it is split admin 2016-9-23 0688 admin 2016-9-23 09:36
A CxA has conducted the installation inspections and functional performance test admin 2016-9-23 0587 admin 2016-9-23 09:34
A regularly occupied space near transparent glazing does not receive regular sun admin 2016-9-23 0600 admin 2016-9-23 09:31
Which components are a part of monitoring-based commissioning?(Choose 3) admin 2016-9-23 0672 admin 2016-9-23 09:27
Which product would contribute to Option 2 Optimization of MR Credit Building Pr admin 2016-9-22 0661 admin 2016-9-22 12:21
A project team is purchasing salvaged bricks from a local company that sourced t admin 2016-9-22 0638 admin 2016-9-22 11:18
A project team for a retail project is conducting a waste stream study over a 24 admin 2016-9-22 01440 admin 2016-9-22 11:15
Which first step must all projects take before attempting EA Prerequisite Minimu admin 2016-9-22 0679 admin 2016-9-22 11:13
A retail project includes a retail merchandise area, stockroom, and two private admin 2016-9-22 0637 admin 2016-9-22 11:10

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 20:39 , Processed in 0.053287 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部