LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
A 50,000 SF (4,645 m2) retail project has a baseline parking capacity of 4 parki admin 2016-9-23 0588 admin 2016-9-23 15:35
How could a project team minimize the amount of contrast building occupants expe admin 2016-9-23 0597 admin 2016-9-23 15:31
At which point during a project schedule is the Basis of Design created? admin 2016-9-23 0586 admin 2016-9-23 15:29
When mapping the surrounding density within a 1/4 mile (400-meter) radius of the admin 2016-9-23 0616 admin 2016-9-23 15:21
A project includes some salvaged wood flooring costing $50,000 and that was purc admin 2016-9-23 0698 admin 2016-9-23 15:19
Which design strategy would NOT lead to higher recovery rates of recyclable mate admin 2016-9-23 0604 admin 2016-9-23 15:15
What fixtures or fittings would be included in the baseline water consumption fo admin 2016-9-23 0587 admin 2016-9-23 15:12
An office pursuing LEED ID+C has two functional building entries. One entrance i admin 2016-9-23 0583 admin 2016-9-23 15:02
In which unit is green power measured? admin 2016-9-23 0569 admin 2016-9-23 15:00
A daycare facility has children’s toilets. What should the plumbing engineer ve admin 2016-9-23 0592 admin 2016-9-23 14:57
A project team is working with an owner to determine what the cost of Carbon Off admin 2016-9-23 0613 admin 2016-9-23 14:54
Views into interior atria may be used to meet up to which percentage of the requ admin 2016-9-23 0569 admin 2016-9-23 14:53
The commissioning authority, with the help of the design team and contractors, i admin 2016-9-23 0611 admin 2016-9-23 14:50
seven-story hotel project has a housekeeping and laundry space on the first flo admin 2016-9-23 0697 admin 2016-9-23 14:44
A company occupies an entire building and wants to certify a renovated portion o admin 2016-9-23 01512 admin 2016-9-23 14:40
If a tenant is replacing base building systems, in a new HVAC&R system how much admin 2016-9-23 0640 admin 2016-9-23 14:40
A global restaurant chain is building out the interior of a restaurant. The rest admin 2016-9-23 0594 admin 2016-9-23 14:36
A project team has convened to identify targeted LEED credits, identify initial admin 2016-9-23 0598 admin 2016-9-23 14:31
A project team has not performed a tenant-level energy model for EA Prerequisite admin 2016-9-23 0677 admin 2016-9-23 14:25
An owner, architect, and general contractor in a goal-setting workshop for a ret admin 2016-9-23 0594 admin 2016-9-23 14:14

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 20:39 , Processed in 0.041458 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部