A retail clothing project is located in a mall. All of the following would help admin 2016-9-27 0605 admin 2016-9-27 07:58
When determining the total vehicle parking capacity for a site, which informatio admin 2016-9-27 0608 admin 2016-9-27 07:57
A building owner is reviewing sites that could meet LT Credit Surrounding Densit admin 2016-9-27 0602 admin 2016-9-27 07:56
For the building envelope what documents can be used to confirm the envelope com admin 2016-9-27 0609 admin 2016-9-27 07:55
An office project in a cold climate burns natural gas on-site for heating and us admin 2016-9-27 0653 admin 2016-9-27 07:53
The project has 100,000 SF total area of existing interior nonstructural element admin 2016-9-27 0625 admin 2016-9-27 07:51
The architect and other project designers are reviewing material choices for a n admin 2016-9-27 0626 admin 2016-9-27 07:50
A multi-story condominium is within a 1/2-mile (800-meter) walking distance of t admin 2016-9-27 0697 admin 2016-9-27 07:49
For which part of the project design would a project team use tracer gas modelin admin 2016-9-27 0621 admin 2016-9-27 07:46
What is the maximum points a project can earn by selecting a tenant space in a L admin 2016-9-27 0579 admin 2016-9-27 07:44
Which actions does a retail building owner need to take to prevent or minimize o admin 2016-9-27 0746 admin 2016-9-27 07:43
A building has an existing brick enclosure and steel structure. The drywall has admin 2016-9-27 0604 admin 2016-9-27 07:42
Which type(s) of EPD is(/are) always created from a product category rule? admin 2016-9-27 0575 admin 2016-9-27 07:41
For MR Prerequisite Storage and Collection of Recyclables at least two of which admin 2016-9-27 0582 admin 2016-9-27 07:40
A 50,000 SF (4,645 m2) retail project has a baseline parking capacity of 4 parki admin 2016-9-27 0638 admin 2016-9-27 07:36
Early in a design process what does a project team need to ensure that the tenan admin 2016-9-27 0596 admin 2016-9-27 07:34
An office project will have a 5% energy improvement over a baseline building. Th admin 2016-9-27 0618 admin 2016-9-27 07:33
What integrated design solutions allow an offices to be moved within a tenant sp admin 2016-9-27 0618 admin 2016-9-27 07:32
The LEED Pilot Credit for Occupant Engagement is listed only for the O+M rating admin 2016-9-27 0598 admin 2016-9-27 07:30
If a project boundary is not obvious because of ownership by multiple entities, admin 2016-9-27 0618 admin 2016-9-27 07:30

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 20:46 , Processed in 0.042823 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部