A project site is surrounded by the following densities:

The land area
admin 2016-9-30 0617 admin 2016-9-30 13:46
When is the performance path more appropriate than the prescriptive path for ene admin 2016-9-30 0596 admin 2016-9-30 13:34
For retail projects what is the required number of waste streams with dedicated admin 2016-9-30 0594 admin 2016-9-30 13:34
In an urban area an existing building has a parking deck with 200 parking spaces admin 2016-9-30 0618 admin 2016-9-30 13:33
If a building includes a multiple-zone recirculating system and the project team admin 2016-9-30 0642 admin 2016-9-30 09:31
After the owner documents their owner\\\'s project requirements (OPR), the proje admin 2016-9-30 0664 admin 2016-9-30 09:29
After project registration you find a credit the project is attempting is listed admin 2016-9-30 0754 admin 2016-9-30 09:28
A 2,500 SF (233 m2) store pursuing LEED ID+C: Retail is located near a bicycle n admin 2016-9-30 0653 admin 2016-9-30 09:26
For an office project a team is trying to address effective acoustic design. For admin 2016-9-30 0634 admin 2016-9-30 09:24
What design decisions will help a project earn points under the prescriptive pat admin 2016-9-30 0633 admin 2016-9-30 09:12
If a project team is pursuing the prescriptive path of WE Prerequisite Indoor Wa admin 2016-9-30 0647 admin 2016-9-30 09:10
A tenant is leasing 6 stories of an old 10-story building. The base building sys admin 2016-9-30 0619 admin 2016-9-30 09:09
A project team is considering options for diverting the construction waste for a admin 2016-9-30 0601 admin 2016-9-30 09:06
A product will count toward the achievement of MR Credit Building Disclosure and admin 2016-9-30 0631 admin 2016-9-30 09:03
What is the flow rate (gallons per minute) of a 0.2 gallons per cycle (0.76 lpc) admin 2016-9-30 0603 admin 2016-9-30 09:02
A LEED ID+C project will be constructed and operated on a permanent location on admin 2016-9-30 0672 admin 2016-9-30 09:00
A project has a 150-kW PV array that will produce 210,458 kWh of electricity per admin 2016-9-30 0631 admin 2016-9-30 08:57
For EQ Credit Low-Emitting Materials what building products and systems would th admin 2016-9-30 0607 admin 2016-9-30 08:55
What products would both contribute towards MR Credit Building Product Disclosur admin 2016-9-30 0605 admin 2016-9-30 08:54
How is a project going to achieve EQ Credit Low-Emitting Materials without compl admin 2016-9-30 0626 admin 2016-9-30 08:52

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 20:55 , Processed in 0.042804 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部