An indoor water use calculated baseline case consists of which information for? admin 2016-12-22 01141 admin 2016-12-22 11:37
For an IPM policy when do occupants need to be notified when the application of admin 2016-12-22 0633 admin 2016-12-22 11:37
A project team doesn\\\'t have end-use energy data available. If the team wants admin 2016-12-22 0729 admin 2016-12-22 11:37
A project with mixed-mode ventilation is located in an area where ozone exceeds admin 2016-12-22 0594 admin 2016-12-22 11:37
A project team has identified existing policies, practices, equipment, contracts admin 2016-12-22 0606 admin 2016-12-22 11:37
Some carpet purchased for a project contains 70% recycled content. The costs rel admin 2016-12-22 02162 admin 2016-12-22 11:37
What type of project would benefit from calculating a reduction in emissions fro admin 2016-12-22 0678 admin 2016-12-22 11:37
A project team has completed executing a commissioning plan. In the process the admin 2016-12-22 0583 admin 2016-12-22 11:37
All performance periods must overlap and conclude within how many days of each o admin 2016-12-22 01582 admin 2016-12-22 11:37
A project team is meeting with school authorities to identify the best opportuni admin 2016-12-22 0627 admin 2016-12-22 11:37
A commercial office building has several tenant spaces. A solid waste management admin 2016-12-22 01288 admin 2016-12-22 11:37
What is a difference between original commissioning and ongoing commissioning? admin 2016-12-22 0787 admin 2016-12-22 11:37
A project can\\\'t meet the outdoor airflow rates for ASHRAE 62.1-2010 because o admin 2016-12-22 01261 admin 2016-12-22 11:37
A residential project is not able to meet the leakage requirements for ETS contr admin 2016-12-22 0730 admin 2016-12-22 11:37
What types of incentives are NOT allowed to optimize the survey results for LT C admin 2016-12-22 01138 admin 2016-12-22 11:37
When surveying visitors on-location for alternative transportation when must the admin 2016-12-22 01112 admin 2016-12-22 11:37
A project team member has excluded a section of land in order to meet the requir admin 2016-12-22 0578 admin 2016-12-22 11:37
Which minimum contract length is required for Renewable Energy and Carbon Offset admin 2016-12-22 01327 admin 2016-12-22 11:37
During the performance period what equipment must meet the sustainability criter admin 2016-12-22 0597 admin 2016-12-22 11:37
A project team is inventorying the regularly occupied spaces of an office buildi admin 2016-12-22 01468 admin 2016-12-22 11:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 21:24 , Processed in 0.045062 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部