LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
A building has a 100,000 SF (9,290 m2) roof. What roofing materials, if present, admin 2016-12-22 01422 admin 2016-12-22 11:37
A 25,000 SF (2,325 m2) mixed-use building is cooled by four rooftop units (RTUs) admin 2016-12-22 01250 admin 2016-12-22 11:37
What minimum perimeter measurements are required for Light Pollution Reduction? admin 2016-12-22 0576 admin 2016-12-22 11:37
If CFC-based refrigerants are maintained in the building, annual leakage rate mu admin 2016-12-22 0576 admin 2016-12-22 11:37
A project team inventoried the powered janitorial equipment for a school project admin 2016-12-22 01275 admin 2016-12-22 11:37
A project has the following credits and end dates for their performance periods: admin 2016-12-22 01284 admin 2016-12-22 11:37
A project team is using the USGBC equipment emissions reduction calculator to es admin 2016-12-22 0553 admin 2016-12-22 11:37
Which people must respond to a survey in order to achieve IEQ Credit Occupant Co admin 2016-12-22 0613 admin 2016-12-22 11:37
In a hotel project what areas of the building are excluded from the Thermal Comf admin 2016-12-22 01412 admin 2016-12-22 11:37
When calculating alternative transportation trips a carpool with four people is admin 2016-12-22 01391 admin 2016-12-22 11:37
At a minimum what must occur for Thermal Comfort? admin 2016-12-22 0585 admin 2016-12-22 11:37
What is capital improvement that could help achieve at least a 5-10% improvement admin 2016-12-22 01024 admin 2016-12-22 11:37
What correctly characterizes an ASHRAE Level 1 energy audit as it applies to EA admin 2016-12-22 0881 admin 2016-12-22 11:37
Which water end use, if present on a project, does NOT need to be metered for WE admin 2016-12-22 0557 admin 2016-12-22 11:37
What needs to be in place for a project to set an indoor baseline water use usin admin 2016-12-22 0733 admin 2016-12-22 11:37
At a minimum what ongoing purchases must be included in an EPP policy for an off admin 2016-12-22 01223 admin 2016-12-22 11:37
A project building is not ENERGY STAR eligible because of the unique space type. admin 2016-12-22 01308 admin 2016-12-22 11:37
What credit is going to include peak visitors in the calculations? admin 2016-12-22 0732 admin 2016-12-22 11:37
For a project that has an irrigation meter installed how would the project team admin 2016-12-22 0576 admin 2016-12-22 11:37
What activity makes sure that the building is delivering for the tenants and occ admin 2016-12-22 0697 admin 2016-12-22 11:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 21:30 , Processed in 0.301238 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部