试卷: LEED v4 BD+C英文模拟题(D)[查看] In order to reduce the amount of construction and demolition waste to be disposed of in landfills and incineration facilities, LEED encourages the recycling and reuse of materials. In order to gain more points in Mr score point: Construction and demolition waste management, which of the following requirements can a project choose to meet A: Option one pathway 1 converts 50% and three material streams B: option one pathway 2 converts 75% and three material streams C: Option 2 produces no more than 2 pounds of construction waste per square foot of floor area D: Option 2 produces no more than 2.5 pounds of construction waste per square foot of floor area 参考答案: D |
|