LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 158|回复: 0
打印 上一主题 下一主题

In a school project, the ventilation of the laboratory did not meet the work req

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2020-8-28 09:35:31 |只看该作者 |倒序浏览
试卷: LEED v4 BD+C英文模拟题(C)[查看]
In a school project, the ventilation of the laboratory did not meet the work requirements, so the person in charge required to modify the design scheme. In order to avoid this situation again and delay the construction period, should?
A: More facilities should be added in the design, with sufficient margin to meet any demand
B: Please have a long-term cooperation with the school\'s construction team
C: In the early stage of design, residents and owners are invited to participate in the seminar
D: Conduct household satisfaction survey

参考答案: C
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 23:23 , Processed in 0.079444 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部