LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 260|回复: 0
打印 上一主题 下一主题

70. P3.1 Manage Precip on Site (meet BMP database req)
C3.3 Manage prec

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2022-9-13 16:24:52 |只看该作者 |倒序浏览
试卷: SITES AP 英文判断题(v2)A[查看]
70. P3.1 Manage Precip on Site (meet BMP database req)
C3.3 Manage precip beyond baseline \"
P3.2 Reduce water use for landscape irrigation (min 3 yrs)
C3.4 Reduce outdoor water use \"
C3.6 Restore aquatic ecosystems (min 4 yrs up to 10 yrs)
P4.2 Control and manage invasive plants (min 3 yrs)
C4.7 Conserve and restore native plant communities (min 3 yrs)
C6.2 Provide optimum site accessibility, safety and wayfinding (6 mos to 1 yr)
C6.4 Support mental restoration (6 mos to 1 yr)
C6.5 Support physical activity (6 mos to 1 yr)
C6.6 Support social connection (6 mos to 1 yr)
P7.3 Restore soils disturbed by construction OR P7.4 Restore soils disturbed by previous development (min 5 yrs)
C9.1 Promote sustainability awareness and education (6 mos to 1 yr) → Section 9: Credit 9.3
Plan to monitor and report site performance
Eligible Prereq/Credits for Monitoring


参考答案: 正确
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 23:22 , Processed in 0.076992 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部