LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 372|回复: 0
打印 上一主题 下一主题

A project team has installed individual thermal comfort controls for occupants.

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-29 12:12:30 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
A project team has installed individual thermal comfort controls for occupants. How can the team validate the building performance to comply with ASHRAE 55-2004?
A: Install a permanent monitoring system
B: Survey the occupants
C: Implement a measurement and verification plan
D: Conduct air quality testing

参考答案: B

本题解释:
Reference: Indoor Environmental Quality Credit, Thermal Comfort-Verification

Performance can be validated either by surveying the occupants or analyzing environment variables. The permanent monitoring system may apply to either approach, but the results still must be validated within 6 to 18 months after occupancy.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 05:04 , Processed in 0.076892 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部