An office manager and project owner are documenting the office equipment used in a project. What equipment must be included in the calculations for Energy and Atmosphere Credit, Optimize Energy Performance-Equipment and Appliances?
A: All products with a plug load
B: All building envelope products
C: All appliances and equipment installed at the time of occupancy
D: All task lighting

参考答案: C

本题解释:
All appliances and equipment installed at the time of occupancy must be included in the submittal for Energy and Atmosphere Credit, Optimize Energy Performance-Equipment and Appliances.

HVAC, lighting, and building envelope products are excluded.

Plug load refers to all equipment plugged into the electrical system- from office equipment to refrigerators. Many non-hardwired lighting fixtures have plug loads, and lighting is excluded from this credit.


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:16 , Processed in 0.072328 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部