A renovation project will have 50 tons of demolition debris. Of the construction waste, 5 tons can be donated, 15 tons can be recycled, and 5 tons will be reused on-site. Which statements are true regarding this project’s certification?(choose 2)
A: The project would earn one point for Materials and Resources Credit, Construction Waste Management
B: The 5 tons of reused material can’t contribute to Materials Reuse if it is included in Construction Waste Management
C: The project cannot earn MR Credit, Construction Waste Management because the donated materials do not comply
D: The recycled material would count toward Materials and Resources Credit, Recycled Content

参考答案: AB

本题解释:
The project is diverting 25 tons (5 donated, 15 recycled, 5 reused) from the waste stream, so one point can be earned for Construction Waste Management. Materials and Resources Credit, Construction Waste Management can earn 1 pt for 50% recycled or salvaged waste.

The 5 tons of reused material cannot contribute to Materials Reuse if the materials are included in Construction Waste Management. See MR Credit 3, Reused Materials Found Off-Site. Materials qualifying for MR Credit 3 cannot be applied to MR Credits 1, 2, 4, 6 or 7.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:07 , Processed in 0.075841 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部