试卷: LEED AP ID+C 模拟试卷A[查看] A project team member is verifying that occupants have a connection to the outdoors. The project space is a 5-story office building. What calculations are required to determine if views are available?
A: Measuring at 30 inches above the floor and at a maximum of 5 ft. intervals B: Measuring direct line of site to perimeter glazing and the horizontal view at a typical seated eye height C: Measuring at a radius of twice the width of the glazing from the center of the glazing D: Measuring the window-to-floor ratio 参考答案: B
本题解释: Reference: Indoor Environmental Quality Credit, Daylight and Views-Views, Implementation
Views require direct line of site to perimeter glazing between 30 inches and 90 inches above the finish floor and a horizontal view at 42 inches. |
|