LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 619|回复: 0
打印 上一主题 下一主题

The materials cost for a retail project will be $337,500. The project team speci

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-30 10:16:55 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
The materials cost for a retail project will be $337,500. The project team specified several recycled-content materials. What percentage of the overall materials cost of the project can the recycled content apply to?

Cost Material Content
$ 65,000; Structural Steel ; 5% Post-consumer Recycled, 90% Pre-Consumer;
$ 7,400 ; Particle Board ; 95% Pre-consumer;
$ 22,000 ; Carpet ; 25% Post-consumer, 75%Pre-consumer;


A: 12%
B: 26%
C: 15%
D: 7%

参考答案: C

本题解释:
For this calculation remember that post-consumer recycled material counts for the full percentage while pre-consumer recycled material only counts for 1/2 the pre-consumer percentage of content.

($65,000 X 5%) + (65,000 X 90% X 0.5) = 3,250 + 29,250 = $32,500

$7,400 X 95% X 0.5 = $3,515

($22,000 X 25%) + ($22,000 X 75% X 0.5) = $13,750

$32,500 + $3,515 + $13,750 = $49,765

$49,765 / $337,500 = 15%
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:46 , Processed in 0.073685 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部