LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 499|回复: 0
打印 上一主题 下一主题

A project building does not have a way to modulate the HVAC system in response t

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-30 10:16:55 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷B[查看]
A project building does not have a way to modulate the HVAC system in response to space demand. What minimum supply volumes for a fan-powered (VAV) box would meet the criteria equipment efficiency and zoning controls?
A: 30% below the peak design flow rate
B: 22.5% below the peak design flow rate
C: 20% below the peak design flow rate
D: 15% below the peak design flow rate
E: 10% below the peak design flow rate

参考答案: B

本题解释:
背下来
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:47 , Processed in 0.078899 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部