LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 348|回复: 0
打印 上一主题 下一主题

A project team has not been able to perform an energy simulation for Energy and

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-3 09:23:20 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷B[查看]
A project team has not been able to perform an energy simulation for Energy and Atmosphere Credit, Optimize Energy Performance-HVAC. For Sustainable Sites Credit, Site Selection, On-site Renewable Energy, where can the project team find information to determine the energy cost supplied by the renewable energy systems?
A: US DOE 2003 Commercial Sector Average Energy Costs by State
B: EPA Energy Guide by Metro Area
C: Commercial Buildings Energy Consumption Survey
D: Registered Project Tools database

参考答案: C

本题解释:
Reference: Sustainable Sites Credit, Site Selection, On-site Renewable Energy, Calculations

Energy calculations can come from :

1. The energy calculated by a whole building energy simulation for Energy and Atmosphere Credit, Optimize Energy Performance-HVAC
2. CBECS database
3. Utility bills (prior 12 months is needed)

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:26 , Processed in 0.074674 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部