What is true about the timing of commissioning as it relates to a building flush

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-3 09:23:20 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷B[查看]
What is true about the timing of commissioning as it relates to a building flush-out?
A: Commissioning can occur during the flush-out if it does not introduce any additional contaminants into the building
B: Commissioning can only occur at the same time as a flush-out if an occupied flush-out is being performed
C: Commissioning must be completed before the building flush-out
D: Commissioning cannot begin until after the building flush-out has been completed

参考答案: A

本题解释:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo

Commissioning can occur during the flush-out if it does not introduce any additional contaminants into the building.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:43 , Processed in 0.073548 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部