LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 413|回复: 0
打印 上一主题 下一主题

A building is being renovated and the owner will occupy the fourth floor of a 4-

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-3 09:23:20 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷B[查看]
A building is being renovated and the owner will occupy the fourth floor of a 4-story building. A new tenant has signed a lease for the first floor and will be trying to earn LEED certification for a new restaurant. What will not need submetering to help earn Energy and Atmosphere Credit, Measurement and Verification?
A: Plug loads
B: Natural gas used to heat water
C: Natural gas used for heating spaces
D: Service water

参考答案: D

本题解释:
See Energy and Atmosphere Credit, Measurement and Verification, Implementation, Case 1, Submetering, Table 2

Water used for the convenience of occupants does not need to be submetered.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 09:59 , Processed in 0.078830 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部