LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 547|回复: 0
打印 上一主题 下一主题

A project team is reviewing the building elements of an existing space that coul

[复制链接]

1759

主题

1

好友

5678

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 17:13:07 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
A project team is reviewing the building elements of an existing space that could be reused in a new tenant fit out. The building will be 80% owner occupied. Which items cannot be included in Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Components?(choose 2)
A: Floor to ceiling walls
B: Subfloor
C: Exterior doors
D: Built-in cases

参考答案: BC

本题解释:
Notes:

This credit requires maintaining existing non-shell, non-structure components, such as walls, flooring, and ceiling.

Exterior doors are part of the shell and are not included.

The subfloor is a structural component and not included.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-6 05:47 , Processed in 0.073739 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部