试卷: LEED AP ID+C 模拟试卷D[查看]
A project space was selected in a LEED certified building. The building owner demolished the project space prior to the project team’s design. Which credit achievement has been defeated by this act?
A: Innovation in Design Credit, LEED Accredited Professional
B: Sustainable Sites Credit, Site Selection, LEED Certified Building
C: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-During Construction
D: Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Components

参考答案: D

本题解释:
Notes:

See Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Components, Prior Condition

The interior calculations were needed in order to earn the credit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-6 05:48 , Processed in 0.071573 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部