LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 199|回复: 0
打印 上一主题 下一主题

An office condominium was built on a site with an existing imperviousness of 36%

[复制链接]

1759

主题

1

好友

5678

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:31:43 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
An office condominium was built on a site with an existing imperviousness of 36%. The pre-development discharge volume of stormwater is 8,000 gallons. What can the maximum post-development discharge volume be to qualify for Sustainable Sites Credit, Site Selection, Stormwater Design-Quantity Control?
A: 4,000 gallons
B: 8,000 gallons
C: 6,000 gallons
D: 2,000 gallons
E: 10,000 gallons

参考答案: B

本题解释:
Notes:

Note that the question specifically asks for the maximum post-development discharge volume.

The site has an existing imperviousness that is less than or equal to 50%. Because of this, the post-development peak discharge rate and the quantity must not exceed the pre-development peak discharge rate and quantity to meet the requirements of Sustainable Sites Credit, Stormwater Design-Quantity Control, Option 1. The question gave a pre-development discharge rate of 8,000 gallons. The post-development discharge rate would have to be the same or less than this pre-development discharge rate.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-8 18:42 , Processed in 0.077845 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部