Which factors are used to calculate the baseline irrigation use for a project? (

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:31:43 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷C[查看]
Which factors are used to calculate the baseline irrigation use for a project?(choose 3)
A: Potable water use as determined by water meter bills
B: Irrigation efficiency
C: Average gallons of irrigation water used
D: Species factor
E: Density factor

参考答案: BDE

本题解释:
See SS Credit 1, Option 2, Path 7, Calculations
The baseline case requires the landscape coefficient using average value that represent conventional equipment and design practices.
The landscape coefficient is used to compute the evapotranspiration rate. To get this value the landscape coefficient must first be computed:
Landscape coefficient = species factor X density factor X microclimate factor.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-7 00:02 , Processed in 0.092760 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部