The project team is considering bringing in temporary ventilation units to cool the facility during construction. What is true about this decision?
A: The temporary ventilation units cannot be used as part of the IAQ Management Plan During Construction
B: The temporary ventilation units will meet all the SCMACNA requirements for the IAQ Management Plan During Construction
C: The temporary ventilation units will mitigate all contamination of the occupied spaces during construction if MERV 13 filters
D: The temporary ventilation units meet the SMACNA control measure for HVAC protection

参考答案: D

本题解释:
Notes:

Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Duri

Temporary ventilation units can be used to meet the HVAC protection required by SMACNA measures.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:14 , Processed in 0.075164 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部