During an early design review, a project team has decided to consolidate the bui

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 16:22:18 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题A[查看]
During an early design review, a project team has decided to consolidate the building footprint and
add underground parking. These changes can contribute to earning which credits(choose 2)
A: Sustainable Sites Credit, Stormwater Design-Quantity Control
B: Sustainable Sites Credit, Heat Island Effect-Nonroof
C: Water Efficiency Prerequisite, Water Use Reduction
D: Sustainable Sites Credit, Alternative Transportation-Parking Capacity

参考答案: AB

本题解释:
Notes:


Stormwater runoff volumes can be reduced by consolidating the building footprint and designing
the building with underground parking. This strategy also reduces heat island effects.


Changing the building footprint and where parking is located does not necessarily mean that total
parking capacity will change.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 23:25 , Processed in 0.083773 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部