A 1-story 20,000 square foot office space has 3 rooftop HVAC units. Two units serve the east and west wings, and the third unit serves a group of private offices. How many samples are needed for air testing to earn Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before Occupancy?
A: 1
B: 3
C: 6
D: 5

参考答案: B

本题解释:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo

Sampling depends on the size of the building and the number of HVAC systems.

One sampling point is needed per every 25,000 SF as well as one sampling point for each area served by a separate ventilation system.

In this example the building was only 20,000 sq. ft. but there were 3 HVAC units, so at least 3 samples are needed.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 22:56 , Processed in 0.075872 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部