LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 284|回复: 0
打印 上一主题 下一主题

A project team in a cooler climate is working on the heating system design to ke

[复制链接]

1759

主题

1

好友

5680

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 18:42:55 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题D[查看]
A project team in a cooler climate is working on the heating system design to keep
occupants warm in the wintertime. What environmental factors does the team need to
consider?(choose 2)
A: Indoor lighting levels
B: Air speed
C: Radiant temperature
D: Acoustic levels

参考答案: BC

本题解释:
Notes:
Reference: Indoor Environmental Quality Credit, Thermal Comfort-Design, Standards
This credit references ASHRAE 55-2004 which defines the following environmental
factors:
-temperature
-thermal radiation
-humidity
-air speed
Also included are two personal factors:
-activity
-clothing
Thermal radiation is the heat radiated from a warm object, such as a lightbulb, or incoming
heat from windows due to sunshine.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-21 03:44 , Processed in 0.084364 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部