- 注册时间
- 2012-6-6
- 最后登录
- 2025-4-28
- 阅读权限
- 200
- 积分
- 5684
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED AP BD+C模拟题D[查看] A project design includes a 12,000 gallon stormwater cistern to capture stormwater from
the roof of the building. The stormwater harvested in the cistern can be substituted for
potable water uses in what aspects of the building? (choose 2) A: Dishwashers B: Fire suppression C: Custodial work D: Laundry washing 参考答案: BC
本题解释: Notes:
See Sustainable Sites Credit, Stormwater Design-Quantity Control, Implementation,
Harvesting Stormwater Runoff
Stormwater can be substituted for potable water uses in several areas:
-irrigation
-fire suppression
-flush fixtures
-janitorial cleaning |
|