LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 364|回复: 0
打印 上一主题 下一主题

Which of the following statements is NOT true regarding Innovation in Design cre

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:41:11 |只看该作者 |倒序浏览
试卷: LEED GA模拟题C[查看]
Which of the following statements is NOT true regarding Innovation in Design credits for exemplary performance?
A: They are generally awarded for doubling the credit requirements and/or achieving the next incremental percentage threshold
B: One point is awarded for each Innovation in Design credit for exemplary performance achieved
C: Exemplary performance is available to all LEED credits
D: There are limits as to how many exemplary performance points can be awarded

参考答案: C

本题解释:
Notes:

Reference: LEED 2009 for New Construction and Major Renovations Rating System

Note this question asks what is not true.

Exemplary performance points are generally awarded for doubling the credit requirements and/or achieving the next incremental percentage threshold.

For instance, an ID credit for exemplary performance in water use reduction (LEED for New Construction v3, WE Credit 3) requires a minimum of 45% savings (30% for 2 points, 35% for 3 points, 40% for 4 points).

Exemplary performance only earns a project one point, no matter how much extra the credit threshold is exceeded.

For instance, an ID credit for exemplary performance in water use reduction (LEED for New Construction v3, WE Credit 3) requires a minimum of 45% savings (30% for 2 points, 35% for 3 points, 40% for 4 points). But if the project achieved a 50%, 55%, or 80% water use reduction, only one exemplary performance point would be earned.

Not all LEED credits have an exemplary performance option. Brownfield redevelopment is an example of a credit that does not. Project teams either redevelop the brownfield, or they don\'t. LEED doesn\'t allow remediating 50% of a brownfield and leaving the rest of the site contaminated, and awarding exemplary performance if the project team remediates 100% of the site. No, the credit requires remediating the entire site. Therefore there is no exemplary performance.

The Innovation in Design category can earn a maximum of 6 points; therefore, there are limits to how many exemplary performance points can be earned. For example, in LEED for New Construction, the maximum is 3 points.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 22:40 , Processed in 0.085421 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部