LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 616|回复: 0
打印 上一主题 下一主题

A project team has excluded a section of land in order to meet the requirements

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:41:11 |只看该作者 |倒序浏览
试卷: LEED GA模拟题D[查看]
A project team has excluded a section of land in order to meet the requirements of one of the LEED credits. What is true about this action?
A: This action would not be allowed under any of the rating systems
B: This action is allowed if gross floor area of LEED project is <2% of the gross land area within the boundary
C: This action would only be allowed under the LEED for Existing Buildings: Operations & Maintenance rating system
D: Certain sections of land can be excluded from site boundary if a responsible party submits a licensed exemption form

参考答案: A

本题解释:
Notes:

Reference: LEED 2009 Minimum Program Requirements
A:Land cannot be excluded for the purposes of complying with a credit/prerequisite. This is known as gerrymandering.
B:If the gross floor area is less than 2% of the gross land area within the LEED project boundary the project doesn’t meet the Minimum Program Requirements.
C:No rating system permits this action.
D:The Licensed Professional Exemption Form can be used by a project team’s registered professional engineer, registered architect, or registered landscape architect to submit a streamlined path to certain credits, bypassing otherwise required submittals--O&M introduction
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享1 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 11:27 , Processed in 0.077589 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部