- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED GA模拟题C[查看] What steps would be included in the pre-design phase of a green building project?(choose 2) A: Document green materials and systems B: Establish project goals and green building criteria C: Site selection D: Test green solutions 参考答案: BC
本题解释: Notes:
Reference: Sustainable Building Technical Manual: Part II
Review this document and note the various steps of an environmentally responsive design process.
A:This is part of the construction documents phase.
B:Establish project goals and green building criteria occurs in the pre-design phase.
C:Site selection occurs in the pre-design phase.
D:This is part of the schematic design phase. |
|