A school project will use some old school lockers that were salvaged from a fitn

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:41:11 |只看该作者 |倒序浏览
试卷: LEED GA模拟题E[查看]
A school project will use some old school lockers that were salvaged from a fitness center located 70 miles away. What LEED credits will this decision help with?(choose 2)

A: Regional Materials
B: Building Reuse
C: Recycled Materials
D: Construction Waste Management
E: Materials Reuse

参考答案: AE

本题解释:
A:Because the material is located within a 500 mile radius, the lockers count as a Regional Material.
B: Building Reuse is the reuse of major building elements such as the shell, roof, structural flooring, or interior wall partitions.
C: Recycled materials are those materials that contain pre or post consumer recycled content.
D:Construction waste management addresses diverting construction debris from the project site from landfills.
E:Materials Reuse includes salvaged materials found either onsite or offsite.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 11:31 , Processed in 0.075305 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部