LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 167|回复: 0
打印 上一主题 下一主题

At a minimum, a project team must successfully do which of the following to obta

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:41:11 |只看该作者 |倒序浏览
试卷: LEED GA模拟题C[查看]
At a minimum, a project team must successfully do which of the following to obtain LEED certification?
(choose 2)
A: Gather documentation for 40 points of the 110 points available
B: Gather documentation for the prerequisites
C: Hire a USGBC approved consultant
D: Record all vendors used on the project

参考答案: AB

本题解释:
The minimum number of points required for certification is 40.

Projects must meet all prerequisites to earn LEED certification and submit documentation for the credits being attempted.

USGBC consultants are not required for projects.

The product vendors are not needed when submitting documentation on the project.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 12:04 , Processed in 0.072774 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部