LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 372|回复: 0
打印 上一主题 下一主题

In an urban high-rise building, a contractor is preparing to begin construction

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2022-12-8 16:28:52 |只看该作者 |倒序浏览
试卷: WELL AP v2模拟题 A卷[查看]
In an urban high-rise building, a contractor is preparing to begin construction on a 10,000 ft2 (930m2) tenant suite. The team is preparing to use a combination of strategies during construction to mitigate the risk of construction pollution to the tenant suite. Envelope protection and filter replacement are some of the strategies that can be used. What is another strategy that can be used during construction to reduce the risk of construction pollution?在一座城市高层建筑中,承包商正准备开始建造 10,000 平方英尺(930 平方米)的租户套房。该团队正准备在施工期间使用组合策略来降低施工污染对租户套房的风险。围护结构保护和过滤器更换是其中一些可以使用的策略。在施工过程中还可以采用什么策略来降低施工污染风险?
A: Envelope sizing围护结构尺寸
B: Humidity management湿度管理
C: Retrocommissioning 重新调试
D: Moisture and dust managemen潮湿和粉尘管理

参考答案: D
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:05 , Processed in 0.074387 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部